September 11, 2001. New Yorkers were heading to the polls to vote on the next mayor of the city. It was a morning full of promise and baseball fans were excited about the Yankees' chances of making the playoffs, the Mets thinking about the future, and the start of the new football season. In other words, it was a day not much different than those September days we've been experiencing in the New
Showing posts with label 4WTC. Show all posts
Showing posts with label 4WTC. Show all posts
Tuesday, 10 September 2013
12 Years Later: Remembering 9/11
Posted on 15:45 by Unknown
Posted in 1WTC, 2WTC, 3WTC, 4WTC, 9/11, Al Qaeda, anniversaries, Ground Zero, infrastructure, James Zadroga, Lower Manhattan, New York City, project 2996, rebuilding, terrorism, WTC Memorial, WTC Museum, WTC Transit Hub
|
No comments
Saturday, 31 August 2013
Lower Manhattan and World Trade Center Views
Posted on 09:15 by Unknown
Corbin Building, the Fulton Center, and 195 Broadway from Dey Street
The WTC Transit Hub from Greenwich Street at Vesey
Looking down Greenwich St at the WTC Transit Hub and 3 and 4 WTC
Detail of the 1WTC base cladding
4WTC exterior finished; the building needs interior work, but is in its final form.
Looking up at 1WTC and 4WTC.
Ornate detail work on 140 West
Posted in 1WTC, 3WTC, 4WTC, Fulton Street Transit Hub, Lower Manhattan, rebuilding, WTC Transit Hub
|
No comments
Tuesday, 11 September 2012
Remembering 9/11 Eleven Years Later
Posted on 06:25 by Unknown
On a morning not all that different than the one forecast for today, it was a bolt from the blue. The skies over New York City were a crisp bright blue with nary a cloud in a sky. It was a morning full of promise.
September 11, 2001 and New Yorkers were heading to the polls to vote on the next mayor of the city. People were talking baseball and the upcoming football season, just as they are
September 11, 2001 and New Yorkers were heading to the polls to vote on the next mayor of the city. People were talking baseball and the upcoming football season, just as they are
Posted in 1WTC, 2WTC, 3WTC, 4WTC, 9/11, Al Qaeda, Fulton Street Transit Hub, MTA, Osama bin Laden, PANY-NJ, PATH, rebuilding, World Trade Center, WTC Transit Hub
|
No comments
Wednesday, 27 June 2012
The Rebuilding of Ground Zero, Part 166
Posted on 10:55 by Unknown
It's been a streak of bad luck at 4WTC since the tower was topped out earlier this week.
Yesterday, a construction worker was impaled on a steel rod he was carrying when he fell about six feet. That worker is expected to recover from his injuries.
Today, workers at street level had to dodge falling glass when a piece of steel being raised on the south side of the tower struck the facade more
Yesterday, a construction worker was impaled on a steel rod he was carrying when he fell about six feet. That worker is expected to recover from his injuries.
Today, workers at street level had to dodge falling glass when a piece of steel being raised on the south side of the tower struck the facade more
Thursday, 14 June 2012
The Rebuilding of Ground Zero, Part 164
Posted on 06:40 by Unknown
President Barack Obama and First Lady Michelle Obama will be visiting the World Trade Center site this afternoon to view progress at the site as part of a trip to New York City that includes two fundraisers for the 2012 campaign.
The trip will disrupt the commutes of tens of thousands of people who use the PATH station at the WTC (myself included), but the President needs to do more than just
The trip will disrupt the commutes of tens of thousands of people who use the PATH station at the WTC (myself included), but the President needs to do more than just
Friday, 30 March 2012
The Rebuilding of Ground Zero, Part 156
Posted on 10:05 by Unknown
1 WTC (the Freedom Tower) is poised to be the tallest building in New York City within the next two weeks. It's just a matter of time before the steel perimeter reaches its apex and work can proceed on the roof and antenna levels. "The World Trade Center perimeter steel is up the 100th floor," said Foye, at a press conference following the authority's monthly board meeting today. "I think if not
Posted in 1WTC, 2WTC, 3WTC, 4WTC, Freedom Tower, Ground Zero, rebuilding, World Trade Center, WTC Museum
|
No comments
Wednesday, 14 March 2012
The Rebuilding of Ground Zero, Part 155
Posted on 07:00 by Unknown
The Freedom Tower (1WTC) is approaching its topping out. The tower is probably a week or two away from completing the bulk of construction. While the tower's antenna would remain to be built, the rest of the tower would be in the process of being fitted out for occupation.
Meanwhile, the NYPD has come up with a new security plan that makes little sense and would do more to disrupt traffic in
Meanwhile, the NYPD has come up with a new security plan that makes little sense and would do more to disrupt traffic in
Thursday, 16 February 2012
Construction Accident At 4WTC Resulting in Subway Service Diversion On 1 Line
Posted on 08:55 by Unknown
A crane lifting a load on 4WTC apparently suffered some kind of problem and the load dropped 40 stories to an area that is off-limits.The load plunged some 40 stories. Debris fell into a closed-off area of the construction site after the crane’s cable snapped.
The Fire Department says some of the beams fell on an unoccupied trailer. A construction worker nearby was looked at by emergency
The Fire Department says some of the beams fell on an unoccupied trailer. A construction worker nearby was looked at by emergency
Tuesday, 24 January 2012
The Rebuilding of Ground Zero, Part 152
Posted on 08:55 by Unknown
Once again, rebuilding at Ground Zero is threatening to come to a screeching halt. This time, Larry Silverstein is warning that rebuilding of 3WTC, which was designed by Richard Rogers, would be capped at a stump of 7 stories, because he can't find tenants and wont build it out on spec. The discussions with the Port Authority of New York and New Jersey, which owns the lower Manhattan site, are
Posted in 1WTC, 2WTC, 3WTC, 4WTC, Freedom Tower, Larry Silverstein, Lower Manhattan, PANY-NJ, PATH, rebuilding, WTC Museum, WTC Transit Hub
|
No comments
Subscribe to:
Posts (Atom)